PROJECT

Peakaboo ADU

STATUS

Complete

TEAM

Kevin Wronske, Kyle Reckling, Devyn Miska

LOCATION

Highland Park, Los Angeles, California

An accessory dwelling unit in Highland Park started construction in May, 2021. Completed April 2022.

 

03/15/21: Construction Begins!

03/01/20: Postponed by COVID

11/15/18: Working its way through plan check. Here’s a 3D print of the ADU. It’s two bedroom, 2.5 bath with a large central courtyard. The 1,200 square foot size limitation on ADUs gave us some flexibility to create more open space rather than maximize floor area.